Boikarabelo Coal FEED Project | Resource Generation | South Africa | Front-end engineering design | Front-end engineering design for the development of an open-pit mine to support both the export and domestic power generation markets | Undisclosed | 2010-2011 |
Makhado Coal Project | Coal of Africa | South Africa | Feasibility study and front-end engineering design | Project management, engineering design (civil, structural, mechanical and electrical) and drafting services, management of mine design for three open-cast pits, scoping study for underground mining upside potential, procurement, peer reviews and review of cost estimates | ZAR8.5 million | 2010 - 2011 |
Tweefontein Optimisation – FEED Project | Xstrata Coal | South Africa | Front-end engineering design | The RSV Enco/Parsons Brinkerhoff Joint Venture was appointed for the completion of the front-end engineering design for 10% capital estimate. Services included project management, civil, structural, mechanical, electrical and instrumentation design, drafting services, quantity surveying services, drafting services and geotechnical investigation | ZAR40 million | 2010 - 2011 |
Design of Shaft Foundations for No 10 Shaft | Resolution Copper Mining | North America | Design of shaft foundations for No 10 Shaft | Civil design of shaft foundations for No 10 Shaft | US$316,429 | 2006-2007 |
Design Services Refrigeration Plant | Resolution Copper Mining | North America | Design and engineering services | Detailed design and engineering services for the refrigeration plant, including design of piping support structures, civil structures, and, electrical and instrumentation for the first water cooled plant | US$1.1 million | 2011 |
LOM Compressed Air | Resolution Copper Mining | North America | Engineering, design and drafting services | Engineering, design and drafting services for the LOM compressed air design which will support the overall pre-feasibility study | US$165,000 | 2011 |
LOM Hoisting Study Update | Resolution Copper Mining | North America | Engineering services | LOM hoist and shaft pre-feasibility study | US$468,000 | 2011/2012 |
Number 10 Shaft Double Drum Auxiliary Hoist Civil Design | Resolution Copper Mining | North America | Number 10 Shaft double drum auxiliary hoist civil design | Number 10 Shaft double drum auxiliary hoist civil design | US$187,754 | 2008-2009 |
Ventilation and refrigeration design required for the Resolution Copper 10 shaft project | Resolution Copper Mining | North America | Ventilation and refrigeration design required for the No 10 shaft project | Ventilation and refrigeration design required for the No 10 shaft project | US$329,660 | 2007 |
Shaft Boring Systems (SBS) – Detailed Engineering | Rio Tinto – JS Redpath | Phoenix, Arizona, North America | Shaft Boring Systems (SBS) – detailed engineering | Develop the technology in order to test and prove the concept on a pilot project. Assist with design input for the sinking stage and headframe portion of the project | ZAR19.9 million | 2011 – 2012 |
Gosowang Expansion Project | Newcrest Mining Australia | Gosowang Province, Indonesia | Development of the K2 and K link high grade epithermal gold deposits located 350 m below surface | Develop designs and procedures for the manufacturing and installation of self-supporting concrete brattice wall and concrete lining of the shaft | US$180 million budget managed by consultant | In progress |
Driefontein Ya Rhona Shaft | GoldFields | South Africa | Shaft barrel failure contingency measures | Design engineering and inspection services | Undisclosed | 2008 |
Brakfontein Merensky Project | Anglo American Platinum | South Africa | Engineering, design and procurement | Engineering, design and procurement | ZAR1.1 billion | 2004-2010 |
Ranger 3 Uranium | Energy Resources of Australia Ltd | Northern Territory, Australia | Study work | Geotechnical review and design work | Undisclosed | 2010-2011 |