Kinsevere Mine | MMG | DRC | | | | |
Mashitu Principal & Sud Geological & Mining Study | ENRC | Kolwezi District, DRC | Geological and mining study in support of ENRC's business strategy | Geological re-modelling of the deposits and resource estimation to a PFS level, geotechnical and hydrological assessments | Undisclosed | 2011-2012 |
Dukwe Project | African Copper | Botswana | Infrastructure and opencast mining project | EPCM | ZAR766 million | 2005-2006 |
Lift II Project | Palabora Mining Company | Phalaborwa, South Africa | Order of magnitude study and early works engineering | Order of magnitude study and early works engineering | ZAR3.6 million | 2011 |
Lift II Project | Palabora Mining Company | Phalaborwa, South Africa | Pre-feasibility study | Pre-feasibility study | ZAR43.6 Million | 2012 - Current |
Palabora Lift II Project | Palabora Mining Company | Phalaborwa, South Africa | Lift II Order of Magnitude Study | Lift II order of magnitude study | ZAR3.7 million | 2011 |
Shaft ore handling System Phase 1 and 2 of No 9 and 10 Shaft | Resolution Copper Mining | North America | Shaft ore handling System Phase 1 and 2 | Consulting services for the shaft ore handling System Phase 1 and 2 for No 9 and 10 Shaft | US$343,000 | 2007-2008 |
Design of Shaft Foundations for No 10 Shaft | Resolution Copper Mining | North America | Design of shaft foundations for No 10 Shaft | Civil design of shaft foundations for No 10 Shaft | US$316,429 | 2006-2007 |
Design Services Refrigeration Plant | Resolution Copper Mining | North America | Design and engineering services | Detailed design and engineering services for the refrigeration plant, including design of piping support structures, civil structures, and, electrical and instrumentation for the first water cooled plant | US$1.1 million | 2011 |
LOM Compressed Air | Resolution Copper Mining | North America | Engineering, design and drafting services | Engineering, design and drafting services for the LOM compressed air design which will support the overall pre-feasibility study | US$165,000 | 2011 |
LOM Hoisting Study Update | Resolution Copper Mining | North America | Engineering services | LOM hoist and shaft pre-feasibility study | US$468,000 | 2011/2012 |
Number 10 Shaft Double Drum Auxiliary Hoist Civil Design | Resolution Copper Mining | North America | Number 10 Shaft double drum auxiliary hoist civil design | Number 10 Shaft double drum auxiliary hoist civil design | US$187,754 | 2008-2009 |
Ventilation and refrigeration design required for the Resolution Copper 10 shaft project | Resolution Copper Mining | North America | Ventilation and refrigeration design required for the No 10 shaft project | Ventilation and refrigeration design required for the No 10 shaft project | US$329,660 | 2007 |
Shaft Boring Systems (SBS) – Detailed Engineering | Rio Tinto – JS Redpath | Phoenix, Arizona, North America | Shaft Boring Systems (SBS) – detailed engineering | Develop the technology in order to test and prove the concept on a pilot project. Assist with design input for the sinking stage and headframe portion of the project | ZAR19.9 million | 2011 – 2012 |
No 10 Shaft Head Frame Design | Resolution Copper Mining | North America | No 10 Shaft head frame design | No 10 Shaft head frame design | US$445,890 | 2006 |
Number 10 Shaft Head Frame Construction | Resolution Copper Mining | North America | Number 10 Shaft dead frame construction – approval of construction queries, methods and drawing details | Number 10 Shaft dead frame construction – approval of construction queries, methods and drawing details | US$157,380 | 2008-2009 |
Cable and Pipe Rack Design | Resolution Copper Mining | North America | Cable and Pipe Rack Design | Design of a ground pipe and cable rack system for the Number 9 and Number 10 Shafts. | US$120,740 | 2008 |
Professional Services | Resolution Copper Mining | North America | Project management | Project management and design services | US$8 million to date | 2007 - current |
Design, engineering and implementation of the dewatering of the Magma Mine workings | Resolution Copper Mining | North America | Design, engineering and implementation of the dewatering of the Magma Mine workings | Design, engineering and implementation of the dewatering of the Magma Mine workings | US$345,326 | 2007 |
LOM Dewatering Study | Resolution Copper Mining | North America | Engineering, design and drafting services | Engineering, design and drafting services for the LOM dewatering and compressed air design which will support the overall pre-feasibility study | US$175,000 | 2011 |
Consulting services required for the skip loading conceptual design for the rock handling system | Resolution Copper Mining | North America | Consulting services required for the skip loading conceptual design for the rock handling system | Consulting services required for the skip loading conceptual design for the rock handling system | US$237,530 | 2007 |
LOM Hoist Study Phase 1 and 2 | Resolution Copper Mining | North America | LOM hoist study Phase 1 and 2 | LOM hoist study Phase 1 and 2 | US$113,720 | 2006-2007 |