Consulting Engineers & Project Managers to the Mining Industry

Copper

icon copperWe are fast expanding our field of experience in the Copper Mining Industry and have already completed a number of projects across the globe. Our latest project has taken us as far afield as Mongolio for the Oyu Tolgoi Project. Some of our clients include Palabora Copper, Rio Tinto, ENRC and African Copper. Our services in this commodity have included Pre-feasibility and Feasibility Studies, Geological Evaluations, Design & Detailing, Project Construction Management and EPCM Projects.

Who to contact


Koelmans R

Rein Koelmans

CEO: RSV (Pty) Ltd

Tel: +27 11 498 6019

e-mail: rsv@rsv.co.za


 



Related Projects


Project NameClient NameProject LocationProject DescriptionScope of ServicesProject ValueDuration
Kinsevere MineMMGDRC
Mashitu Principal & Sud Geological & Mining StudyENRCKolwezi District, DRCGeological and mining study in support of ENRC's business strategyGeological re-modelling of the deposits and resource estimation to a PFS level, geotechnical and hydrological assessments Undisclosed2011-2012
Dukwe ProjectAfrican CopperBotswanaInfrastructure and opencast mining projectEPCMZAR766 million2005-2006
Lift II ProjectPalabora Mining CompanyPhalaborwa, South AfricaOrder of magnitude study and early works engineeringOrder of magnitude study and early works engineeringZAR3.6 million2011
Lift II ProjectPalabora Mining CompanyPhalaborwa, South AfricaPre-feasibility studyPre-feasibility studyZAR43.6 Million2012 - Current
Palabora Lift II ProjectPalabora Mining CompanyPhalaborwa, South AfricaLift II Order of Magnitude StudyLift II order of magnitude studyZAR3.7 million2011
Shaft ore handling System Phase 1 and 2 of No 9 and 10 ShaftResolution Copper MiningNorth AmericaShaft ore handling System Phase 1 and 2Consulting services for the shaft ore handling System Phase 1 and 2 for No 9 and 10 ShaftUS$343,0002007-2008
Design of Shaft Foundations for No 10 ShaftResolution Copper MiningNorth AmericaDesign of shaft foundations for No 10 ShaftCivil design of shaft foundations for No 10 ShaftUS$316,4292006-2007
Design Services Refrigeration PlantResolution Copper MiningNorth AmericaDesign and engineering servicesDetailed design and engineering services for the refrigeration plant, including design of piping support structures, civil structures, and, electrical and instrumentation for the first water cooled plantUS$1.1 million2011
LOM Compressed AirResolution Copper MiningNorth AmericaEngineering, design and drafting servicesEngineering, design and drafting services for the LOM compressed air design which will support the overall pre-feasibility studyUS$165,0002011
LOM Hoisting Study UpdateResolution Copper MiningNorth AmericaEngineering servicesLOM hoist and shaft pre-feasibility studyUS$468,0002011/2012
Number 10 Shaft Double Drum Auxiliary Hoist Civil DesignResolution Copper MiningNorth AmericaNumber 10 Shaft double drum auxiliary hoist civil designNumber 10 Shaft double drum auxiliary hoist civil designUS$187,7542008-2009
Ventilation and refrigeration design required for the Resolution Copper 10 shaft projectResolution Copper MiningNorth AmericaVentilation and refrigeration design required for the No 10 shaft projectVentilation and refrigeration design required for the No 10 shaft projectUS$329,6602007
Shaft Boring Systems (SBS) – Detailed EngineeringRio Tinto – JS RedpathPhoenix, Arizona, North AmericaShaft Boring Systems (SBS) – detailed engineeringDevelop the technology in order to test and prove the concept on a pilot project. Assist with design input for the sinking stage and headframe portion of the projectZAR19.9 million2011 – 2012
No 10 Shaft Head Frame DesignResolution Copper MiningNorth AmericaNo 10 Shaft head frame designNo 10 Shaft head frame designUS$445,8902006
Number 10 Shaft Head Frame ConstructionResolution Copper MiningNorth AmericaNumber 10 Shaft dead frame construction – approval of construction queries, methods and drawing detailsNumber 10 Shaft dead frame construction – approval of construction queries, methods and drawing detailsUS$157,3802008-2009
Cable and Pipe Rack DesignResolution Copper MiningNorth AmericaCable and Pipe Rack DesignDesign of a ground pipe and cable rack system for the Number 9 and Number 10 Shafts.US$120,7402008
Professional ServicesResolution Copper MiningNorth AmericaProject management Project management and design servicesUS$8 million to date2007 - current
Design, engineering and implementation of the dewatering of the Magma Mine workingsResolution Copper MiningNorth AmericaDesign, engineering and implementation of the dewatering of the Magma Mine workingsDesign, engineering and implementation of the dewatering of the Magma Mine workingsUS$345,3262007
LOM Dewatering StudyResolution Copper MiningNorth AmericaEngineering, design and drafting servicesEngineering, design and drafting services for the LOM dewatering and compressed air design which will support the overall pre-feasibility studyUS$175,0002011
Consulting services required for the skip loading conceptual design for the rock handling systemResolution Copper MiningNorth AmericaConsulting services required for the skip loading conceptual design for the rock handling systemConsulting services required for the skip loading conceptual design for the rock handling systemUS$237,5302007
LOM Hoist Study Phase 1 and 2Resolution Copper MiningNorth AmericaLOM hoist study Phase 1 and 2LOM hoist study Phase 1 and 2US$113,7202006-2007

 